Exterior Wrap

Exterior Wrap 1 500 x 375

The first step of an exterior wrap is to excavate the foundation.

exterior_wrap_2 500 x 375

This is followed by dry cold joint to prepare for peel and stick membrane.

exterior_wrap_3 500 x 375

Primer and peel and stick membrane is applied.

exterior_wrap_4 500 x 375

Now the new foundation coating is applied.

exterior_wrap_5 500 x 375

Delta membrane with Big “O” and gravel started.

exterior_wrap_6 500 x 375

Add closure strip and finish gravel drainage layer.

exterior_wrap_7 500 x 375

Install interior sump system.

exterior_wrap_8 500 x 375

Backfill trench and finish.